Saturday, December 21, 2013

A group of neighbors met by the manager of the company in order to find a quick solution bahan ne t


A group of neighbors met by the manager of the company in order to find a quick solution bahan ne to a street that floods bahan ne every time it rains. Since the company was committed to another meeting.
Over the past week, the commission of residents of Barrio El Pinar requested a meeting with the company Ceramics Cortínez. The reason for the request, because the only access to the company is a street that is piped in one hand, the tube was placed from Pottery Cortínez bahan ne when asphalted. The drawback, mentioned the neighbors bahan ne is that when it rains the road is flooded.
Because of this situation, the neighbors contend that this problem is fixed. Since the company were received by the gerenten Norberto Gutierrez, who hear the complaints from neighbors and informed them that the company plans to modify access and have expansion plans.
Lujan Online reserves the right to refuse comments that include offensive, inappropriate or no real identity of the user content. This site is not responsible for the contents stated in the comments space. This space is designed to comment on the subject of each note. Comments about other topics may be removed.
Most popular today two vehicles collided bahan ne on Route 7 Isabel, 105 years celebrated his birthday A man and a child arrested after breaking into a house armed began the rolling blackouts at the request of "lower energy charge" Neighbours will be mobilized today against an antenna
Sorry, your blog can not share posts by email.

No comments:

Post a Comment